| 1. | Fully mechanized sublevel caving method adopted in the dynamic pressure condition 动压条件下的综放开采方案 |
| 2. | Some critical issues in application of pillarless sublevel caving method 无底柱分段崩落法应进一步研究的几个问题 |
| 3. | Ground pressure behavior of light top - coal caving method in extremely thick and soft seam 极软特厚煤层轻放开采矿压显现规律 |
| 4. | Mining horizontal pillars with hydraulic roof propping in longwall caving method 在长壁式崩落法中用液压支柱护顶回采水平矿柱 |
| 5. | Analysis of the way for the main roof caving relating to the staggered sublevel caving method 错层位放顶煤方法老顶垮落方式分析 |
| 6. | Relationship of support and surrounding rock in three soft seam extracted by top - coal caving method 三软煤层普放面矿压规律及合理支护研究 |
| 7. | Study on stability of the end face in ultra soft and thick seams using fully mechanized sublevel caving method 极软厚煤层综放开采端面稳定性研究 |
| 8. | The analysis on roof control of working face of medium - thickness coal seam comprehensive mechanized top coal caving method 中厚煤层综采放顶煤工作面顶板管理 |
| 9. | Analysis of influence factors on the convergence of stoping drift in sublevel caving method without bottom structure 无底柱分段崩落法回采巷道收敛的影响因素分析 |
| 10. | Destructive study of the cover rock relating to the fully mechanized mining with caving method under ravelly ground and nappe 松散层及推覆体下综放开采覆岩破坏研究 |